In addition to installing false floors to shallow swimming pools Poly Advisory Services also infill swimming pools to reduce the depth. To do this new sumps are created and pipework installed as necessary. The floor is then filled with an aireated lightweight concrete mix to minimise the weight added to the structure. Once cured tie bars are installed into the walls and tied into steel mesh. A 150mm concrete slab is then installed which is completely tied into the structure. The infill is left to dry then until the residual moisture content is low enough for us to install our PASLAM lining membrane to the floor area. Full details will available soon, for more information Contact Us |